California Avenue Reconstruction

ESE provided geotechnical investigation, pavement design, civil design, construction management, full time inspection and material testing services for the reconstruction of 0.4 miles of California Avenue.

Project Elements

  • Geotechnical Investigation

  • Bidding Assistance

  • Construction Management

  • Construction Support

  • Civil Engineering Design

  • Pavement Design

  • Utility Coordination

  • Final Design

Project Description

The scope of work included pavement designs for complete reconstruction of the roadway with 6 inches of plantmix bituminous pavement on 8 inches of aggregate base (AB).   As part of the project portions of curb, gutter, and sidewalk were replaced. 

Commercial and residential driveways, and 6 ADA ramps were reconstructed to meet ADA compliance.   The street frontage at Newlands Park was realigned to add a sidewalk and improve pedestrian circulation at Newlands Park.  

Previous
Previous

Dresslerville Road Reconstruction

Next
Next

Tamarack Lodge